High Standard Facilities

img

No Installation Fee

Hashmax does not charge installation fee for all of the facilities.

img

No Hidden Fee

Hashmax does not charge other fees than the ones mentioned.

img

Inspect Anytime

You are more than welcome to make an appointment for inspections of our facilities.

img

Price Negotiable

Our hosting prices are always negotiable depending on the amount of miners.

YAAN Ⅱ

A facility that’s with good building structure and design, preventing too much dust and water molecules from entering the facility and miners while giving a good ventilation at the same time. Miners in this facility has longer life cycle in general.

  • Location : Yaan City, Sichuan Province, China
  • Electricity: Hydropower Station
  • Capacity: 12,000 spots/ 20mw
  • Vacancy: 200 spots
  • Type of miner: Asic miners
  • Price: US$ 45 / KW

WENCHUAN

Operated by our most experienced tech team, this facility has one of the lowest offline rate. The site is right next to the highway, which gives an easy transportation.

  • Location : Wenchuan City, Province
  • Electricity Type: Industrial electricity
  • Capacity: 10,000 spots / 15mw
  • Vacancy: 100 spots
  • Type of miner: Asic miners
  • Price: US$ 52 / KW

YAAN Ⅰ

This facility outstands other facilities with its favorable design. The spacious room and single-row structuring gives an excellent ventilation system.

  • Location : Yaan City, Sichuan Province
  • Electricity Type: Hydropower station
  • Capacity: 10,000 spots / 15mw
  • Vacancy: 300 spots
  • Type of miner: Asic miners
  • Price: US$ 45 / KW

THE XINJIANG

This is a large-scale facility and it is also the largest facility in Hashmax. Located in an industrial estate so this facility is powered by industrial electricity, which makes the facility more stable. It’s a new facility operated by one of out best tech teams, which makes the facility very reliable.

  • Location : Hami City, Xinjiang
  • Electricity Type: Industrial electricity
  • Capacity: 80,000 spots / 84mw
  • Vacancy: 30,000 spots
  • Type of miner: Asic miners
  • Price: US$ 44 / KW

    LESHAN

    Taking advantage of the state-owned power station and the clean energy of hydro power, this facility enjoys a stable electricity supply and a high standard construction. Operated with the help of Bitmain official A/S center, this facility provides in-house repairing service, making miner maintenance more efficient. The facility is now open for hosting GPU mining rigs.

    • Location : Leshan City, Sichuan Province
    • Electricity Type: Hydropower station
    • Capacity: 15,000 spots / 23mw
    • Vacancy: 300 spots
    • Type of miner: Asic miners and GPU mining rigs
    • Price: US$ 49 / KW